• performance comparison of transmission network expansion planning under deterministic and uncertain conditions

    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1393/01/01
    • تاریخ انتشار در تی پی بین: 1393/01/01
    • تعداد بازدید: 591
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     transmission network expansion plans determined considering deterministic or uncertain conditions are evaluated under demand and cost scenarios different from the original design scenarios. performance is measured in terms of minimization of the total expected cost and the range of the operational costs over the new set of assumed scenarios. a test problem for a real network in brazil is presented to assess the robustness of the expansion plans. it is found that transmission plans considering uncertainty performed better than plans under deterministic conditions both in terms of minimization of the total expected cost and the range of operational costs.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین ژورنال ها