• simultaneous allocation of dgs and remote controllable switches in distribution networks considering multilevel load model

    نویسندگان :
    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1393/01/01
    • تاریخ انتشار در تی پی بین: 1393/01/01
    • تعداد بازدید: 568
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     reliability improvement and loss reduction are two important goals in optimal sizing and siting of distributed generations (dgs). also, remote controllable switches can be utilized in distribution networks to increase the role of dgs in reliability improvement. therefore, this paper presents a ga-based method to allocate simultaneously dgs and remote controllable switches in electric distribution networks. the goal of proposed approach is reliability improvement and energy loss reduction. the optimal sizes of distributed generators are also determined during the optimization procedure. a multilevel yearly load model is utilized to achieve the optimal solution. numerical studies on a 33-bus distribution network show satisfactory results.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها
مقالات جدیدترین ژورنال ها