• bi-objective optimization model for integrated preventive maintenance and flexible job-shop scheduling problem

    جزئیات بیشتر مقاله
    • تاریخ ارائه: 1392/07/24
    • تاریخ انتشار در تی پی بین: 1392/07/24
    • تعداد بازدید: 1269
    • تعداد پرسش و پاسخ ها: 0
    • شماره تماس دبیرخانه رویداد: -
     this paper develops an integrated model for flexible job shop scheduling problem with the maintenance activities. reliability models are used to perform the maintenance activities. this model involved two objectives: minimization of the makespan for flexible job shop production part and minimization of system unavailability for the pm (preventive maintenance) part. to aim the objectives, two decisions must be taken at the same time: assigning jobs on machines in order to minimize the makespan and finding the appropriate times to perform pm activities to minimize the system unavailability. these objectives are obtained with considering dependent machine setup times for operations and release times for jobs. in advance, the maintenance activity numbers and pm intervals are not fixed.

سوال خود را در مورد این مقاله مطرح نمایید :

با انتخاب دکمه ثبت پرسش، موافقت خود را با قوانین انتشار محتوا در وبسایت تی پی بین اعلام می کنم
مقالات جدیدترین رویدادها